}
і
591
Kowloon Canton Railway Surgery British Per? Engineer Report
Conclusion
beyond that which Your Excellway
already possCODED
Finally what I have said as to the comparative merits of Railways Nod 1 and 2 ( for surely soute (a) is drad ) may thus be summarised and written.
Cost of Construction. RY1 = RG2 + B 293 650 Working expenses (incl Juan") R4 /= RM2 +81,716,084 Time =
arquised for construction R41 = R92 =
R92 = 2p Gear)
Anticipatul Raffie per annum B$76,250.
瘩
I have the honour to be des
Your aberant servant-
Je Bruce BA.B2.
Chief Surveying Engineer.
Kowloon Canton RY Bortion Pretion
(18)
'',,
No comments yet.
Private notes are available after approval.